Part 100
- A new part of the FCC's rules (47 CFR Part 100) that replaces Part 25 as the licensing framework for space stations and earth stations. Adopted July 22, 2026 in the Space Modernization Report and Order (FCC 26-47, SB Docket No. 25-306); it takes effect on a date the Space Bureau will announce after OMB review.
- Part 100 is the most significant restructuring of FCC satellite rules in decades. It builds a modular licensing process around a reusable Form 312, adds a Variable Trajectory Space Station category, opens annual processing rounds, and sets a default 20-year license term, replacing a framework designed around individual GEO satellites.
Is Part 100 in effect?
Not yet. The FCC adopted Part 100 on July 22, 2026 and released the order on July 23, 2026 (FCC 26-47). The order takes effect 60 days after Federal Register publication, except that Sections 100.1 through 100.304 wait for OMB review under the Paperwork Reduction Act, with the Space Bureau to announce the effective date by public notice (paragraphs 320 and 420). As of October 17, 2026 the order has not been published in the Federal Register, so Part 25 still governs every filing. Applications pending at the switch are decided under the rules in force when the FCC acts (paragraph 332).
What Part 100 changes
The application becomes modular. Form 312 Main Form carries applicant and ownership data and can be filed once and reused across requests; Schedules O and F carry space station technical data and Schedule B covers earth stations (paragraph 8). Technical narratives give way to certifications.
New system categories: GSO, NGSO, Multi-orbit Satellite System, and Variable Trajectory Space Station (VTSS), the last covering orbital transfer vehicles, servicing platforms, and lunar missions (paragraph 11). The streamlined small-satellite track in 25.122 and 25.123 is eliminated (paragraph 103).
Processing rounds become annual and frequency-specific, opening January 1 and closing October 31 each year, initially for Ka-, Ku-, Q-, and V-band (paragraphs 19 and 173). Round systems keep the 50 percent at six years and 100 percent at nine years milestones; missing the first milestone drops a system into a later round rather than capping it (paragraph 22). Surety bonds move to a de-escalating formula and apply only to certain NGSO systems (paragraph 248).
License terms default to 20 years for space stations, earth stations, and market access grants, running from the grant date rather than from in-orbit notification (paragraphs 263 to 266). Earth station applicants with an approved Form 312 and no waivers may operate on a non-interference basis once on public notice (paragraph 13). The five-year LEO disposal requirement carries forward into Sections 100.111 and 100.260.
What happens to existing Part 25 licenses
They stay valid on their existing terms. Part 25 is removed from Title 47 on the effective date, but the Space Bureau will post its full text on a transition page so that license conditions keep their meaning (paragraph 322). Licensees may petition within one year of the effective date to align their term to 20 years (paragraph 330), and licensees with a bond on file that are meeting all obligations and milestones, and were not authorized through a section 25.157 processing round, are generally relieved of their bond obligations (paragraph 327). Transition details are in FCC Part 100 Adopted and the updated FCC Satellite Licensing guide. Orbit Sentinel tracks SB Docket 25-306 filings alongside the rest of the FCC satellite record, free during beta.
Mentioned in The Downlink
- FCC Part 100 Adopted: What Changes for Satellite Operators
The FCC adopted Part 100 to replace Part 25. What changes for licensing, processing rounds, bonds, and license terms, and why Part 25 still applies today.
- Multi-Agency Coordination: FCC, FAA, NOAA, and ITU
A single satellite mission can need approvals from several federal agencies and the ITU, with little coordination between them. Case studies and reform efforts.
- FCC Satellite Licensing: From Application to Authorization
Guide to FCC Part 25 satellite licensing: application process, processing rounds, milestones, bonds, filing types, market access, and Part 100.
- U.S. Space Regulatory Compliance: A Complete Guide
Navigate FCC, FAA, NOAA, and ITU requirements for commercial space missions. Four agencies, timelines, costs, and compliance steps.
- How Ground Station Licensing Works: A Complete Guide
Earth station types, FCC licensing steps, frequency coordination, ESIMs, and common mistakes. A plain-language guide to ground station licensing.